Assign
individual(s) to blow-down system strainers at least once a month.
|
|

|
Install
a union connection between the strainer, trap and check valve.
If service is required, all three components are checked
before reinstallation.
|
|

|
Form
an energy team in each plant that will be made aware of any
recurrent problems with steam system components.
Any system changes should require energy team and engineering
department approval.
|
|

|
Establish
standard specifications. A
hodgepodge of components makes the system vulnerable to problems and
requires maintaining a burdensome inventory of parts.
|
|

|
Install
pressure gauges in the steam and condensate system to head off big
problems by catching them when they're small ones.
|
|

|
Make
sure insulation that is removed for servicing is always
re-installed.
|
|
|
|
Good
energy management is like creating an excellent product - and
insures an edge over the competition.
Waste not ... want not. |